Road Management works table (FOI 10526)

The council's Road Management schedule showing the 2018 reconstruction and 2025 reseal across the bridge section.

Produced byTipperary County Council
Dateobtained 2026
ReferenceFOI 10526, items 6 and 8
StatusHeld on file

The lines that matter

The council's own works schedule records two resurfacing campaigns across the bridge section. Each adds material and raises the road; the parapet was never raised to match.

Source: TCC Road Management system, FOI 10526 items 6 and 8. Held on file.